COMING SOON

PHASE 1 (Lot 108 & 109)

±250,000 SF in each building

Building 108

Building 109

Building SF

±250,000

±250,000

Dimensions

±725’ x ±350’

±725’ x ±350’

Loading

30 DH/6 GL

30 DH/6 GL

Power

4000A | 277/480V

4000A | 277/480V

Parking

500 stalls

500 stalls

Column Spacing

±50’ x ±50’

±50’ x ±50’

Clear Height

±32’

±32’

Divisibility

±75,000 SF

±75,000 SF

Truck Court

158' (concrete)

158' (concrete)

Slab

±7” reinforced
on ±4” AMC

±7” reinforced
on ±4” AMC

Progress Video

Footage from March 2024

GROUND BREAKING EVENTS

Lot 108 Groundbreaking

Lot 109 Groundbreaking

FOR MORE INFORMATION, PLEASE CONTACT:

Jackie Orcutt, SIOR
Senior Vice President
+1 602 735 1978
jackie.orcutt@cbre.com

Pete Wentis
Senior Vice President
+1 602 735 5636
pete.wentis@cbre.com

Kevin Cosca
Senior Vice President
+1 602 735 5672
kevin.cosca@cbre.com

Jonathan Teeter
Vice President
+1 602 735 1929
jonathan.teeter@cbre.com

Alex Wentis
Vice President
+1 602 735 5591
alex.wentis@cbre.com

©2024 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners, and the use of such logos does not imply any affiliation with or endorsement of CBRE. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited.